Plant Bridge Cranes Guide: Erection Step by Step

When loads get too big for forklifts and too precise for rough handling, teams turn to overhead cranes. This practical guide follows the journey from bare runways to a commissioned crane ready for service. You’ll see final load testing and handover—with the same checklists pro installers use.

What an Overhead/Bridge Crane Is

An overhead crane rides on parallel runways anchored to a building frame, with a trolley that travels left-right along the bridge and a hoist that lifts the load. The system delivers three axes of motion: cross-travel along the bridge.

They’re the backbone of heavy shops and assembly lines, from beam handling to turbine assembly.

Why they matter:

Controlled moves for large, expensive equipment.

Huge efficiency gains.

Lower risk during rigging, lifting, and transport inside facilities.

Support for pipelines, structural steel, and big machinery installs.

Scope at a Glance

Runways & rails: continuous beams and rail caps.

End trucks: motorized gearboxes for long-travel.

Bridge girder(s): cambered and pre-wired.

Trolley & hoist: reeving, hook block, upper limit switches.

Electrics & controls: power supply, festoon or conductor bars.

Stops, bumpers & safety: overload protection, e-stops.

Depending on capacity and span, the crane might be a single-girder 10-ton unit or a massive double-girder 100-ton system. The installation flow stays similar, but the scale, lift plans, and checks grow with the tonnage.

Make-Ready & Surveys

Good installs start on paper. Key steps:

Drawings & submittals: Freeze the GA and verify reactions with the structural team.

Permits/JSAs: Job Safety Analysis (JSA) for each lift step.

Runway verification: Check baseplates, grout pads, and anchor torque.

Power readiness: Confirm conductor bars or festoon supports, cable trays, and isolation points.

Staging & laydown: Mark crane components with ID tags.

People & roles: Brief everyone on radio calls and stop-work authority.

Millimeters at the runway become centimeters at full span. Spend time here.

Alignment That Saves Your Wheels

If rails are off, nothing else will run true. Targets and checks:

Straightness & elevation: Laser or total station to set rail height.

Gauge (span) & squareness: Use feeler gauges on splice bars, torque rail clips.

End stops & buffers: Install and torque per spec.

Conductor system: Keep dropper spacing uniform; ensure collector shoe reach.

Log final numbers on the ITP sheet. Misalignment shows up as crab angle and hot gearboxes—don’t accept it.

Girder Erection & End Trucks

Rigging plan: Softeners protect painted flanges. Taglines for swing control.

Sequence:

Lift end trucks to runway level and set temporarily on blocks.

Rig the bridge girder(s) and make the main lift.

Land the bridge on the end trucks and pin/bolt per GA.

Measure diagonal distances to confirm squareness.

Before anyone celebrates, bump-test long-travel motors with temporary power (under permit): ensure correct rotation and brake release. Lock out after test.

Cross-Travel Setup

Trolley installation: Hoist/trolley arrives pre-assembled or as modules.

Hoist reeving: Lubricate wire rope; verify dead-end terminations.

Limits & load devices: Set upper/lower limit switches.

Cross-travel adjustment: Align trolley rails on a double-girder.

Pendant/remote: cost to build Install pendant festoon or pair radio receiver; function-test deadman and two-step speed controls.

Grinding noises mean something’s off—stop and inspect. Don’t mask issues with higher VFD ramps.

Power with Discipline

Power supply: Conductor bars with collectors or a festoon system.

Drive setup: Enable S-curve profiles for precise positioning.

Interlocks & safety: Zone limits near doors or mezzanines.

Cable management: Keep loops short, add drip loops where needed.

Future you will too. If it isn’t documented, it didn’t happen—put it in the databook.

QA/QC & Documentation

Inspection Test Plan (ITP): Hold/witness points for rail alignment, torque, electrical polarity, limit settings.

Torque logs: Record wrench serials and values.

Level & gauge reports: Note any corrective shims.

Motor rotation & phasing: Document bump tests.

Functional tests: Anti-collisions and zone interlocks.

QA/QC is not paperwork—it’s your warranty in a binder.

Ready for Work

Static load test: Hold at mid-span and near end stops; monitor deflection and brake performance.

Dynamic load test: Check sway, braking distances, and VFD fault logs.

Operational checks: Emergency stop shuts down all motions.

Training & handover: Maintenance intervals for rope, brakes, and gearboxes.

Only after these pass do you hand over the keys.

Applications & Use Cases

Construction & steel erection: placing beams, trusses, and precast.

Oil & gas & power: moving heavy pumps, skids, and pipe spools.

Steel mills & foundries: large part transfer.

Warehousing & logistics: high throughput lanes.

Once teams learn the motions, cycle times drop and safety improves.

Safety & Engineering Considerations

Rigging discipline: rated slings & shackles, correct angles, spreader bars for load geometry.

Lockout/Tagout: test before touch every time.

Fall protection & edges: scissor lifts and manlifts inspected.

Runway integrity: regular runway inspection plan.

Duty class selection: overspec when uncertainty exists.

A perfect lift is the one nobody notices because nothing went wrong.

Troubleshooting & Pro Tips

Crab angle/drift: verify end-truck wheel diameters and gearbox mounts.

Hot gearboxes: adjust brake air gap and reduce VFD decel.

Rope drum spooling: check fleet angle and sheave alignment.

Pendant lag or dropout: antenna placement for radio; inspect festoon collectors.

Wheel wear & rail pitting: lubrication and alignment issues.

A 10-minute weekly check saves days of downtime later.

FAQ Snippets

Overhead vs. gantry? Bridge cranes ride fixed runways; gantries walk on the floor.

Single vs. double girder? Span and duty class usually decide.

How long does install take? Anything from a couple weeks to a few months.

What’s the duty class? FEM/ISO or CMAA classes define cycles and service—don’t guess; size it right.

Why Watch/Read This

Students and pros alike get a front-row seat to precision rigging, structural alignment, and commissioning. You’ll gain a checklist mindset that keeps cranes safe and productive.

Looking for a clean handover databook index you can reuse on every project?

Download your pro bundle so your next crane goes in cleaner, faster, and right the first time. Save it to your site tablet for quick reference.

...